Sewer Standard Detail Drawings

Complete Letter Drawing Set - Sewer Details Rev 02-28-17

Complete Plan Sheet Set - Sewer Details Rev 02-28-17

Plan Sheet 1R - WW-01 Through WW-08

Plan Sheet 2 - WW-09 Through WW-16

Plan Sheet 3R - WW-17 Through WW-24

Plan Sheet 4 - WW-25

Sewer Standard Detail Drawings Figure List

Sewer Standard Detail 24" x 36" Plan Sheets Rev 02-28-17

Sewer Standard Detail Drawings Rev 02-28-17

WW-01R Standard 48" Manhole

WW-02R Standard 60" Manhole

WW-03R Standard 72" Manhole

WW-04 External Drop Manhole

WW-05 Standard Manhole Backfill

WW-06 Standard Manhole Benches and Channels

WW-07 Standard Casting Adjustment and Riser Rings

WW-08 Stub-out at Manhole

WW-09 Internal Drop Connection to Existing MH

WW-10 New Pipe Connection to Existing MH

WW-11 New MH Connection to Existing Pipe

WW-12 Sanitary Sewer and Water Main Crossing

WW-13 Rigid San Sewer Pipe Bedding Within 5' of Pavement

WW-14 Rigid San Sewer Pipe Bedding Beyond 5' of Pavement

WW-15 Non-Rigid San Sewer Pipe Bedding Within 5' of Pavement

WW-16 Non-Rigid San Sewer Pipe Bedding Beyond 5' of Pavement

WW-17 Lateral Sewer Connection Layout (Residential)

WW-18R Lateral Sewer Connection Layout (Commercial)

WW-19 Standard Sanitary Cleanout in Paved Areas

WW-20 Standard Sanitary Cleanout in Un-Paved Areas

WW-21-Final Backfill and Traffic Influence Detail

WW-22 Shallow Sanitary Service Connection

WW-23 Deep Sanitary Service Connection

WW-24 Sanitary Service Connection to Existing Pipe

WW-25 Stainless Steel Adjustable Clamping Bracket